Demand Solutions Case StudyIron-Clad Delivery Dates

Ratas AS Keeps Reliability Above 97%

Ratas AS manufactures threaded fittings and stainless steel pipefittings. Ratas AS is part of The Nords International Group.

Challenge: Ratas AS' production planning processes occurred largely in the minds of site managers. As a result, the manufacturer found it difficult to meet delivery dates. Their reliability hovered around 55% to 65% which increased their risk of loosing customers.

Solution: Demand Solutions APS helped the manufacturer improve visibility between plants, reduce inventory and manpower, and increase planning efficiency.

Bottom Line

  • Ratas AS now operates above 97% reliability 
  • Improved customer satisfaction
  • Eliminated spreadsheets used for planning and reporting
  • Enhanced data accuracy and visibility throughout the business